|
Swarte and architect Henk Döll
(at the time with Mecanoo
but now with his own office Döll
- Atelier voor Bouwkunst) snaked the new building between
existing ones via a clever, yet very simple
plan. The two dance theaters are arranged along a line
that extends from the main entry to the back of the site,
with one theater placed on either side of the line and shifted
to one end, their final location based on their size and the
site conditions. Back of house areas for each theater are
placed on the outer edges with the two small film theaters
located above the entry.
|